cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

i need help with this pls
please helpppSolve with ratio sin(30) to solve the missing side length x. Round to the nearest tenth​
Does anyone know what this is? My teacher does not know and she needs it? We think it is a Fitbit but we don't know how to charge it
A triangle has a base that measures 14 inches. The area of the triangle is 3.5 square inches. What is the height of the triangle?
What is the significance of the Third World to the Cold War?
Solve. 1,032 divided by 24 Enter the answer in the box. Response area with 1 text input box
PLEASE HELP!!!! What is the molarity of a solution that contains 42.9g of calcium chloride in a 45.0L solution?
A good piece of advice for subject lines is to be? a) Verbose b) Incomplete c) Direct d) All of the above
rewrite the sentence above so that it is punctuated correctly my mom is concerned about my grades
Please Help me solve this!!​