MaThWiZz6123 MaThWiZz6123
  • 02-07-2021
  • Mathematics
contestada

It take 4 people 40 minutes to clean a garden. How long will it take 6 people to clean the same garden

Respuesta :

loconte loconte
  • 02-07-2021

Answer:

4/9 of an hour (26.666 minutes)

Step-by-step explanation:

4 * x * 40/60 = 1

x * 160/60 = 1

x=60/160 = 6/16 = 3/8 (this is the rate for one worker)

~~~~~~~~~~~~~~~~

6 * (3/8) * x = 1

x = 4/9

Answer Link

Otras preguntas

what is a cubic unit cell ?​
what is a customer courtesy card from wendys?​
U need help ASAP!!!Please explain the answer
Create a parent class called Shape with width and height parameters of type double and a function that returns the area of the shape, which simply returns 0. Th
How to be confident in anywhere and anytime?​
1.When a 19-year-old drinks with his 21-year-old date and crashes her car as a result, it's an example of? A. "forbidden fruit." B. underage buying. C. a lea
when you are do not wear any clothes what kind of hormonal changes happens in your bodytell in detail ​
Based only on the information given in the diagram, which congruence theorems or postulates could be given as reasons why ABC = DEF? Check all that apply. A. AA
Which symbol equation correctly describes the reaction: Wood (mostly glucose) burns in the presence of oxygen to form water and carbon dioxide
If a car starts from rest and attains a velocity of 10m/square in 5 secondscalculate the accerleration​