Brainwash2010
Brainwash2010 Brainwash2010
  • 03-06-2021
  • Mathematics
contestada

12 men or 15 women can do a piece of work in 21 days find the number of days to complete the same work by 6 men and 10 women​

Respuesta :

LIYAH009
LIYAH009 LIYAH009
  • 03-06-2021
18 days required to complete same work by 6 men and 10 women.

Given: 12 men or 15 women can complete work in 21 days
To find: Days it takes to complete same work by 6 men and 10 women

Solution:
12 men = 15 women ⇒ 1 man
Men = women
Men =
15 women can finish the work by 21 days
6 men = women
6 men =
6 men and 10 women = =
women can finish the work= = 18 days.

Hope I helped have a good day
Answer Link

Otras preguntas

√y18 please solve this one for me with explication
What is the meaning of the safety symbol shown below?
11x+2=5x+10+58 show steps
En una encuesta a 150 personas, se les pregunta sobre los deportes que ven por televisión los fines de semana, ofreciendo como opciones fútbol, tenis y basquetb
A farmer has 324 feet of fencing to make three identical adjacent rectangular pens, as shown in the picture. What dimensions of each pen will maximize the total
G(F(x)) = 7√√x+1 A. F(x)=√x and G(x) = 7 B. F(x)= x and G(x) = √√7 C. F(x) = 7x and G(x)=√x+1 D. F(x)=√x+1 and G(x) = 7x
NEED HELP ASAP PLS!! how would you summarize these headlines?
hey guys can you help me with this question love
PLEASE HELP ME!! Use triangle XYZ to answer questions 3-5. 1) Use special right triangles to help find the length of segment XY. What is the exact height of tr
What are the three techniques scientists can use for correlation ? (fossils)