reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

Simplify the expression completely: 4x^2+2x-42/4x /(x-3)
In photosynthesis water molecules are split into ____ and _____ atoms1. Hydrogen and oxygen2. Sulfur and ithium3. Carbon and nitrogen4. glucose and fructose​
If the radius of a circle is doubled, what happens to its area?
Use Pascal's Triangle to determine the second term of the expansion of (x - 2)^5
Martin deposits $700 into a savings account that gains interest at a rate of 5.5% annually. If he waits 7 years to withdraw the money, will he have earned more
what is vamos in english i need your help please
g You are looking to rob a jewelry store. You have been staking it out for a couple of weeks now and have learned the weights and values of every item in the st
If the p-value for a hypothesis test is 0.027 and the chosen level of significance is a=0.05, then the correct conclusion is to
A rectangular prism has a length of 6 cm, a width of 3 cm, and a height of 412cm. The prism is filled with cubes that have edge lengths of 12 cm. How many cubes
How to reform a frustrated farmer