The method of dividing the project scope into many parts that, when combined, would constitute the project deliverable is called _____:

Respuesta :

gomezgerman032 gomezgerman032
  • 04-01-2020

Answer:

decomposition

Explanation:

This is a technique used to divide and subdivide the scope of the project and the future to deliver, in smaller and more manageable parts. It is defined what work is going to be done and which is not. It is a hierarchical decomposition oriented to the deliverable product of work and achieve the objectives of the project.

Answer Link

Otras preguntas

In ΔKLM, k = 700 cm, l = 460 cm and ∠M=78°. Find the length of m, to the nearest centimeter.
Please answer this correctly without making mistakes
Using the Pythagoras Theorem
What is the area of this triangle in the coordinate plane? 25.0 units² 27.5 units² 50.0 units² 55.0 units² A graph with a triangle drawn between coordinates
I got a 60 so I have to do it again and this is one of the questions pleas help
Rachel and Keegan are building a stand like the one shown to display framed photos. what is the surface area of the stand? length 7ft, width 1ft, height 2ft.
Sove for A. R = X(A + B)
How old is Atticus is to kill a mocking bird
The floor of a storage unit is 6 ft long and 8 feet wide what is the distance between two opposite corners of the floor
Need help hurry my phone is about to die math problem