Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

Can you please answer this for me
Solve the inequality.* 4> 15+X x < [?] Enter the number that belongs in the green box. Submit
HELPPPPPPPPPP PLEASEEEEEEEE
A bond is worth $100 and grows in value by 2 percent each half year. find the value of f(1) = 100 (1.02)²^t
Calculate how many grams of NaOH are needed to make 204.68 g of Na2CO3. 2 NaOH(s) + CO2(g) Na2CO3(s) + H2O(l)
First aid is used toa) To save from danger to life b) To clean wound​
Find mode of the following size 2 3 5 6 7 frequency 4 6 2 5 3 1
rationolize the denominator √10 - √5 / √5 - √2
How are the private and public keys generated in the RSA algorithm?
You are choosing between two health clubs. Club A offers membership for a fee of $ 12 plus a monthly fee of $ 27. Club B offers membership for a fee of $ 21 plu