23gantaak
23gantaak 23gantaak
  • 04-04-2019
  • Mathematics
contestada

BRAINLIEST ANSWER: Two workers finished a job in 7.5 days. How long would it take each worker to do the job by himself if one of the workers needs 8 more days to finish the job than the other worker?

Respuesta :

akeel5
akeel5 akeel5
  • 04-04-2019

Answer:

first we must times 7.5 into 8 to find out what the answer is,

the answer is 60

Answer Link

Otras preguntas

List the perfect squares between 100 and 500 that are even numbers.
which is more acidic pH2, pH4 or pH6?
2 friends want to equally share 4/3 feet of rope.What length of rope should ea friend get?
next term in sequence 61, 122, 244, 488
My daughter needs a synonym for tired and all the word she has is problem , story and banquet
what is the prefix of enactment?
Explain why the railroads were not built in a straight line from east to west.
Write an equation for a non-vertical line that contains the point ( 2,-4 )
Can someone help me in probability?Amanda wrote a computer program that generates two random numbers between one and eleven.When she runs it,what is the probabi
What's an equivalent fraction for 10 15 by dividing