ccsmoore6869 ccsmoore6869
  • 02-11-2018
  • Mathematics
contestada

Sean has 20 days to paint as many plays houses and sheds as he is able. The sheds can be painted at a rate of 2.5 per day, and the play houses can be painted at a rate of 2 per day. He has 45 structures that need to be painted.

Respuesta :

yasminothman02 yasminothman02
  • 02-11-2018

n = # of days

45 = 2.5n + 2n

45 = 4.5n

n = 10

He can paint 45 structures in 10 days

Answer Link

Otras preguntas

How can I get rid of my headache without taking any medicine????
Five 2.0-ω resistors are connected as shown in the figure. what is the equivalent resistance of this combination between points a and b?
Exercises that involve hyperflexion or hyperextension of the knee may injure the knee joint. true or false.
what is the answer to math problem 5/12 -___+5/4 =2/3
If you buy 40 tickets for $10, how much are you paying per ticket?
Purpose and audience How u write about Genetic modification of cash crops
Which can be used to characterize blood flow in the human body??
Why did the location of greek settlements allow contact with other civilazations
What bony structures probably became infected by the bacteria or viruses causing the cold?
Describe the behavior of an oxygen molecule in a sealed container